600 Tons/Day Rotary Kiln Clinker Cement Production Line (200,000 t/y)
Description
This 600 t/d cement production line is designed for producing Portland cement (also named silicate cement according to production standards of PRC). The clinker rotary kiln in this cement equipment features a 5-cyclone preheater. Annual output of this cement production line is about 200,000 t.
A computer batching system automatically controls the raw material preparation to ensure qualified raw material controlling rate.
The homogenization coefficient reaches 3-6.
This cement production line is eco-friendly. Waste gases from the production process are all purified by dust collectors. Fine dust from the waste gas treatment process are collected for use.
Production Process of the Cement Production Line
1. Raw material and fuel storage.
a. Dump truck fetches limestone form mines and conveys it into storage yard. The limestone is then crushed by hammer crusher and conveyed into 2-φ10m×24m warehouse via discharge hopper, belt conveyor, elevator and belt conveyor mounted on the warehouse roof.
b. Sandstone is conveyed by automobile into the 18 m× 20 m shed in the cement production line to get dried and crushed. The crushed material is then transported into 20×25×15 m pre-homogenization shed via belt conveyor and S-Model dumper. Crushed sandstone passed though the T shaped corridor and forms a V shaped stack. Loader fetches the sandstone material and put it onto belt conveyor. Elevator then sends the sandstone into φ6 m × 14 m sandstone round warehouse.
c. Dump truck transports iron ore into 18 m × 20 m shed. The iron ore is then sent into 1-φ6m×14m iron powder warehouse of the cement production line.
d. Clay is brought into the 18 m×20 m shed by dump car, dried by the φ2.2m×16m dryer, and then it is sent into the φ6m×14m round storehouse to be stored.
e. Raw coal is conveyed into 18 m×40 m raw coal storage shed by dump truck.
f. Dump truck transports plaster into 15 m×30 m plaster yard. After being crushed, the plaster is sent into 1-φ6m×14m plaster storehouse.
Description
This 600 t/d cement production line is designed for producing Portland cement (also named silicate cement according to production standards of PRC). The clinker rotary kiln in this cement equipment features a 5-cyclone preheater. Annual output of this cement production line is about 200,000 t.
A computer batching system automatically controls the raw material preparation to ensure qualified raw material controlling rate.
The homogenization coefficient reaches 3-6.
This cement production line is eco-friendly. Waste gases from the production process are all purified by dust collectors. Fine dust from the waste gas treatment process are collected for use.
Production Process of the Cement Production Line
1. Raw material and fuel storage.
a. Dump truck fetches limestone form mines and conveys it into storage yard. The limestone is then crushed by hammer crusher and conveyed into 2-φ10m×24m warehouse via discharge hopper, belt conveyor, elevator and belt conveyor mounted on the warehouse roof.
b. Sandstone is conveyed by automobile into the 18 m× 20 m shed in the cement production line to get dried and crushed. The crushed material is then transported into 20×25×15 m pre-homogenization shed via belt conveyor and S-Model dumper. Crushed sandstone passed though the T shaped corridor and forms a V shaped stack. Loader fetches the sandstone material and put it onto belt conveyor. Elevator then sends the sandstone into φ6 m × 14 m sandstone round warehouse.
c. Dump truck transports iron ore into 18 m × 20 m shed. The iron ore is then sent into 1-φ6m×14m iron powder warehouse of the cement production line.
d. Clay is brought into the 18 m×20 m shed by dump car, dried by the φ2.2m×16m dryer, and then it is sent into the φ6m×14m round storehouse to be stored.
e. Raw coal is conveyed into 18 m×40 m raw coal storage shed by dump truck.
f. Dump truck transports plaster into 15 m×30 m plaster yard. After being crushed, the plaster is sent into 1-φ6m×14m plaster storehouse.